Migration Guide

How to Switch from Trello to Asana

A step-by-step guide to migrating your data, settings, and workflows from Trello to Asana without losing anything. Estimated total time: 1.5–3 hours.

Updated April 2026
Trello

Trello

Migrating from

Asana

Asana

Migrating to

Before You Start

  • • Back up all your data from Trello before beginning the migration
  • • Ensure you have admin access to both accounts
  • • Schedule the migration during low-activity hours to minimize disruption
  • • Keep both subscriptions active during the transition period (at least 2 weeks)

Migration Steps

1

Export your data from Trello

15-30 min

Log into Trello, navigate to Settings → Export, and download your data in CSV or JSON format. Make sure to include all projects, contacts, and configuration settings.

2

Create your Asana account

5 min

Sign up for Asana using the link below. We recommend starting with the Premium plan to ensure you have all import features available.

3

Prepare your data for import

20-45 min

Review the exported data and map fields to Asana's format. Most tools use similar field names, but check for any custom fields that need manual mapping.

4

Import data into Asana

15-30 min

Use Asana's import wizard (usually found in Settings → Import) to upload your prepared data. Run a test import with a small batch first to verify field mapping.

5

Verify and configure

30-60 min

Review imported data for accuracy. Set up integrations, automations, and team permissions. Configure notification preferences and connect any third-party tools.

6

Cancel Trello subscription

5 min

Once you've verified everything works in Asana, cancel your Trello subscription. Keep your account active for 30 days as a safety net before fully deleting.

Ready to Switch?

Follow the steps above to migrate from Trello to Asana. Most migrations take 1.5–3 hours.